FGD Wastewater Treatment Center – Sulfate Removal

Client: Westar Energy

Project Date: October 2013 to June 2014

Man Hours: 25,734

Designed and built a new process building to house a new clarifier and process equipment used for removing sulfate from the plant’s FGD wastewater. Wolf worked hand in hand with a Chemical Engineering firm to tie the new Sulfate Removal System into their existing Wastewater treatment facility.

Wolf self-performed the following:

• Piping – Wide Varity of Specialty Pipe
• Millwright – Equipment Setting & Fabrication
• Concrete – Design and Install of Building and Equipment Foundations (w/ Certus)
• HVAC
• Metal Building Erection
• Structural Steel Erection
• Managed Electrical Design and Install